magnifying glass icon
telephone icon Get a quote
cc-is logo


Metallic Structure Refurbishments


As a RISQS audited and verified supplier, CC Infrastructure Services has been a leading subcontractor to numerous companies within the rail sector for over 15 years.

We are a team that provides a lot more than just the services we offer. We have experience of working within the constraints of the railway environment, these include possession hours, blockades, specialist height access, short notice response and Christmas closures; our project management team are experts at ensuring the projects are delivered safely and efficiently.

Working in the rail sector

Our ICATS and PTS accredited teams can offer a range of services when on site both trackside and at stations:

Experience

Over the years we are proud to have played our part in some very notable projects whilst working alongside key rail industry names such as Network Rail, Osborne, Costain, Dyer & Butler, BAM and J Murphy & Sons.

Our projects have had a lasting effect on the customer experience that the public have when utilising the rail infrastructure. 

In the Summer of 2020, our ICATS and PTS teams headed over the water to the Isle of Wight to carry out our structure refurbishment works to Ryde Station Footbridge, on behalf of Osborne. The structure went from looking tired and unsafe to bright, safe and welcoming. This type of paint system has anti-graffiti properties which helps with future graffiti management and withstands general wear and tear. You can see our case study on this project and our other rail sector projects below.

The rail sector is ever growing and shows no signs in slowing down. With constant developments, it is important that we keep up to date and grow with the industry, in both our services but also our experience and qualifications. In October 2020, Steve Featherstone joined our team as our Non-Executive Director. Steve has a huge amount of knowledge and experience within the rail sector, developed over his 13 years working with Network Rail as their Track Programme Director. We are excited to learn more about the rail sector from Steve and grow with it.

Health and Safety is a key priority of ours, with our own dedicated HSEQ manager, we ensure that our teams are fully trained and qualified in all areas necessary to complete the works to a high and safe standard. Find out more about our Health and Safety accreditations here.

PHP Code Snippets Powered By : XYZScripts.com

Phone lines down

Unfortunately our phone lines are down at the moment. If you wish to get in touch
please email us on enquiries@cc-is.co.uk.