magnifying glass icon
telephone icon Get a quote
cc-is logo


CCIS Case Study

London Bridge station redevelopment programme

Industrial Coatings Rail

Rail

icon   Published on: May 26, 2016
Author: Andy Izzard    

Project Overview

Main contractor: Costain

End client: Network Rail / Crossrail

Services provided

  • Brickwork restoration (over 22,000m²)
  • Dust sealant industrial coating application

Specialist training and equipment

  • Microstrip System (both water shield and vacuum blasting)
  • Various MEWPs

Recent case studies

​
PHP Code Snippets Powered By : XYZScripts.com

Phone lines down

Unfortunately our phone lines are down at the moment. If you wish to get in touch
please email us on enquiries@cc-is.co.uk.